ü CHECK THE LEVEL OF THE SERVICE TANK
ü SWITCH ON THE MAIN SUPPLY
ü ALWAYS KEEP BOTH THE SUCTION VALVE OPEN
ü THROTTLE THE MAIN DISCHARGE TO 3/4TH OF A TURN AND SERVICE DISCHARGE TO 1/4TH OF A TURN
ü START AND RUN THE PUMP
ü CHECK THE ALIGNMENT OF THE FLY WHEEL
ü ENSURE THAT THE BEAKERS ARE IN PLACE, SECURED PROPERLY AND EMPTY
ü SWITCH ON THE CONTROL PANEL
ü SET THE CONDITION (LOAD,SULPHUR AND LINER WEAR) AT MAXIMUM RANGE TO PURGE THE SYSTEM
ü SWITCH ON THE POWER TO SOLENOID VALVE
ü SWITCH ON THE FLY WHEEL MOTOR
ü ONCE THE SYSTEM IS PURGED STOP THE FLYWHEEL AND EMPTY THE BEAKERS
ü REPLACE THE BEAKERS
PARAMETERS SETTING |
ü TO SET THE CONTROL PANEL FOR INPUT MODE FOR EACH UNIT PRESS THE INPUT BUTTON REPEATEDLY, SAME IS TO BE DONE FOR THE OUTPUT MODE FOR EACH UNIT
ü LOAD CONDITION CAN BE VARIED FROM 0 TO 100%
ü SULPHUR VARYING FROM 0 TO 4.5% OF THE BUNKER FUEL
ü BOTH THESE PARAMETERS ARE COMMON FOR ALL CYLINDER UNITS.
ü CYLINDER WEAR CAN BE VARIED FROM 0 TO 1.8mm, WHICH IS 0.75% OF CYLINDER BORE (240mm)
ü THIS PARAMETER DIFFERS FOR EACH UNIT
EXPERIMENTAL SET UP |
ü SET THE REQUIRED PARAMETER TO OPTIMUM RUNNING CONDITIONS AND RUN THE FLYWHEEL
ü TO RUN THE SYSTEM FOR 6 TO 7 MINUTES SHUT THE SERVICE DISCHARGE LINE AND KEEP THE MAIN DISCHARGE FULLY OPEN
ü IF YOU ARE INTENDING TO RUN THE SYSTEM FOR 15 MINUTES THROTTLE THE VALVES TO INTIAL CONDITIONS
ü WHILE OPERATING THE CRANK OF THE CROSS SECTION , ENSURE THAT THE MAIN DISCHARGE LINE IS KEPT FULLY OPEN
PRECAUTION |
SWITCH OFF THE SYSTEM IN CASE OF CONTINUOUS FLICKERING OF ANY LED OR ANY UNUSUAL NOISE . THIS MAY BE CAUSED DUE TO VOLTAGE FLUCTUATION INSTRUCTION FOR OPERATION